Project Description

We delivered an artificial grass court to the City of Salo in connection with the Moisio school. A 24 mm white sand-filled artificial grass was chosen, which is perfectly suited for versatile use throughout the year.

The contract also included leveling and compacting the base, ensuring the court's foundation is even and durable. The total area of the court is approximately 1,100 m².

The court is in use year-round: as an ice hockey rink in winter and a playing field in summer for versatile sports use. This makes it an excellent investment that serves users in all seasons.

❄️

Winter

Ice hockey rink during the winter season

☀️

Summer

Versatile playing field during the summer season

🏗️

Groundworks

Leveling and compacting as part of the contract

Photos from the Site

Moisio school field – overall photo

Project Details

Location
Salo
Year
2023
Area
~1,100 m²
Material
24 mm white sand-filled turf
Client
City of Salo
Usage
Year-round
Delivery Included
Artificial grass, leveling, compacting

Want a similar implementation?

Request a Quote

UKK

General Questions About Artificial Grass Installations

Installation time depends on the size of the site and the extent of the groundworks. Typically, a smaller multipurpose court is completed in a few days, while a full-sized football pitch can take 1–2 weeks.
Installation requires dry weather and at least +5 degrees Celsius for optimal seam gluing. The best installation time is from spring until late autumn.
We grant a comprehensive warranty for installation work and materials, which is usually 5–8 years depending on the manufacturer and the product. Regular maintenance is a prerequisite for the warranty to remain valid.